Kings College London

At a Glance

The Development
Kings College London

Client:
Overbury

Market Sector:
Education

Services Supplied:
Carpentry & joinery

Download Case Study

The Brief

The jobs on Kings College were really fast-paced and had to be completed within limited time scales so we had to make sure our supply chain was in place. If necessary, we worked until late at night to get work done in the buildings’ cores, lecture theatres and laboratories, which included doors, ironmongery, reception desks, screens, electronic locks and card systems.

The Approach

We carried out four fit-out jobs across London – Hampstead, King’s College, Weybridge and Islington High Street – for the same contractor (Overbury) on college sites for UCL and Kings College. These were very different to our normal way of working, because we were only on site for between two and four weeks.