UCL Kings College London – Phase 18

At a Glance

The Development
UCL Kings College London – Phase 18

Client:
Overbury

Market Sector:
Education

Services Supplied:
Carpentry & joinery

Download Case Study

The Brief

MJ Hillson carried out four fit-out jobs across London for the same contractor, Overbury: Hampstead, King’s College, Weybridge and Islington High Street  on college sites for UCL Kings College. These were very different to our normal way of working, because we were only on site for between two and four weeks.

The Approach

The UCL Kings College jobs were really fast-paced and had to be completed within limited timescales. We had to make sure our supply chain was in place. If necessary, we worked until late at night to get work done in the buildings’ cores, lecture theatres and laboratories. This included doors, ironmongery, reception desks, screens, electronic locks and card systems.