11th June 2019
Landmark PinnacleAn office fit-out for the sales area of what will be Europe’s tallest residential tower, Landmark Pinnacle, featuring a reception desk, slatted timber wall panelling
21st March 2019
The Post Building, LondonWhen working on The Post Building, location was a big challenge for us. Lorries packed with doors are tricky to unload safely in this busy
20th March 2019
Denmark Hill LondonDenmark Hill was a commercial project completed for Overbury. In a laboratory environment, the doors conformed to certain specifications. For instance, they were “encapsulated” smokeproof,
20th March 2019
Farnham Road HospitalFor Farnham Road Hospital everything had to be designed and installed in such a way that the facility’s service users couldn’t harm themselves. For example,
20th March 2019
Victoria DriveThe biggest challenge for Victoria Drive was getting the drawings signed off. We also managed a change in the specification of the front doors from
20th March 2019
40 Chancery Lane LondonOn 40 Chancery Lane, we faced considerable time pressure on this job because when we arrived, the project was already behind schedule. Our team –
20th March 2019
Battersea Reach Block S LondonDesign considerations were key to the success of the residential project at Battersea Reach Block S– the flooring in the penthouses saw us installing an
20th March 2019
Battersea Reach Blocks K&L LondonLocation was a big challenge for us here. Lorries packed with doors are tricky to unload safely in this busy area of central London. We
20th March 2019
251 Reception LondonThe work we completed on 251 Reception is striking. Bespoke ribbed acoustic panelling was transported to site from Spain, which we then fitted to the
20th March 2019
Trumpington LondonPerhaps the most challenging element of the 36-week project in Trumpington involved meeting the technical brief drawn up by the architect. Panels had to be