20th March 2019
Imperial College LondonImperial College threw up many challenges. We had to overcome the logistical issues of getting the necessary number of doors to the correct floors using
20th March 2019
Imperial College London – Phase 1Because Imperial College was a live learning and working environment, our biggest challenge was working out of hours in order to control dust and noise.
20th March 2019
251 Elephant & Castle LondonOf course, deliveries are a challenge in any part of London, and we needed to manage the logistics of these carefully. But the project at
20th March 2019
Principal Place LondonPrincipal Place was a complicated job. The architectural requirements meant doors of a significantly larger and heavier construction than we had seen before. Added to
20th March 2019
Dyson CentreOur team worked inside the new-build Dyson Centre and on the refurbishment of the library. In the library, we installed new doors, skirting and panelling.
20th March 2019
Triton CourtThe refurbishment of such an iconic building as Triton Court was a complicated project, retaining the façade and stretching between eight and 12 storeys. The
13th March 2019
Here EastThe quality of the fixtures and fittings was extremely high for Here East. Set against a backdrop of a modern, factory-style design with yellow doors,
26th January 2019
Drakes PlaceWe installed roof joists, internal staircases and joists, and some external cladding on this mixture of 60+ town houses and two-storey houses in Aylesbury, working
20th January 2019
Lewisham Gateway LondonOn Lewisham Gateway London, Hillson worked directly with the contractor, SISK, on this new-build, dark-clad affordable home scheme in south London, and being outside the
26th September 2017
Edgware RoadGalliford Try’s residential development is a mix of flats and townhouses – of the eight houses, five are private and three affordable housing and of